该梁的20,000吨体体旋转至90.9度,而山东省东东高
作者:bet356在线官方网站日期:2025/07/04 浏览:
Poster news reporter Bai Xuefei Correspondent Liang Xiaohong Zhou Guocheng Liaocheng Report on July 3, the cross-jiang Kowloon Railway Overpass on the East (A) to Yang (GU) Expressway in Shandong Province, constructed by China Railway Construction Investment Group and Undertaken by China Railway 20th Bureau, successfully completed the rotation construction, achieving accurate alignment, laying a solid foundation for the opening在那天11:05的整个线路中,与现场指挥官的顺序一起,两个插孔与自动连续牵引系统相吻合,形成了这对夫妇的水平扭曲。通过拧紧22条固定在旋转桌周围的钢链,直径为18米,横梁体重20,000吨以每分钟0.02的角度逆时针旋转90.9度,并最终将Pantingot完成至60分钟。北京 - 九龙铁路立交桥的总长度为150米s。通往施工15号码头的主要码头的桥高16.5米。旋转下的北京 - 川铁路火车的平均每日运营是90对火车。火车运行密度很高,建筑条件很复杂。如何确保现有电线操作的安全性,使庞然大物能够正确重量“转弯”成为建筑商必须处理的问题。 "The Beijing-Kowloon railroad is busy with transportation and the trains are dense. In order not to affect normal railroad operations, we used the 60-minute" sunshine point "to perform the leveling method. By tensile jack and measuring instrument, accurately controlled and rotated 90.9 ° counterclockwise."Man Minglin, chief engineer of the Dongyang interchange project of the China Railway 20th Bureau, identified that the main 15号桥的码头距离下游北京 - 九龙铁路中部和30.85米AW 36.1米来自网络的返回线路。对铁路的运营有一定的影响,这很难控制和高安全风险。例如旋转过程中的速度,姿势,角度和其他动态参数,而目标的参数则形成了目标,并计划确保周期过程并不疯狂。中国铁路第20局的东阳交换项目经理杨·富乔(Yang Fuguo)表示,北京 - 川铁路交叉路口的立交桥是Dongyang Expressway的主要控制项目。在施工期间,该项目采用了各种形式,例如反向时间表和劳动竞赛,以成功完成转型的工作,确保其尽快完成后在当地经济发展中服务,并确保铁路运输的安全性。据报道,东道高速公路横路立交桥项目是山东省“第14五年计划” T计划的主要项目解雇发展,这也是杨古县“外出并欢迎发展”的主要项目。完成后,交通间隔将填充,高速公路网络模式将有所改善,高质量的区域经济发展的速度将加速。
相关文章